Print

The Village’s annual Street Improvement Project (SIP) is designed to maintain and improve the condition of our streets. The SIP consists of resurfacing the asphalt roadway in various locations throughout the Village on an as-needed basis.  At times, adjacent curb and sidewalk are also replaced as part of this project, as needed. 

2017 Project Information

This year’s project will include the resurfacing of the following streets:

As is typical with this project, impacts to traffic are minimal as the driving surface will be passable in all phases of the work. The only time the roadway will be inaccessible is when the construction crews are present and working on a particular area. Unfortunately, on-street parking will not be allowed during this work. While an inconvenience, it allows the contractor to work more efficiently and finish the project sooner. Streets to be affected include the following:

  1. Vine - from Thatcher to Keystone
  2. Hawthorne - from Franklin to Lathrop
  3. Franklin - from Oak to Lake
  4. Ashland - from Chicago to Oak
  5. William - from Oak to Quick
  6. Clinton - from Oak to Quick 

Project Updates