Permit and Contractor Requirements
Call Before You Dig
Before you begin digging, remember that Illinois law requires
that you call JULIE (Joint Underground Locating Information
for Excavators) to request that all underground utilities
(natural gas, electric, telephone, cable, water, sewer,
etc.) be located
and marked in the vicinity of the excavation. It's easy for
homeowners and contractors to reach JULIE by dialing 1-800-892-0123,
by dialing 8-1-1 (the 8-1-1 number is another option to reaching
JULIE as it does not replace the existing toll-free number),
or online.
When requesting a locate, you will need to provide your name,
address, phone number, the location of the excavation, the
start date of your project, and the size of the excavation.
You should mark the area of the excavation in white paint or
with stakes. You must request the locate(s) at least 48 hours
(two working days, excluding weekends and holidays) prior to
digging.
Construction Hours
Monday thru Friday - 7:00 a.m. to 6:00 p.m.
Saturday - 8:00 a.m. to 5:00 p.m.
No construction work is allowed on Sundays, New Years Day,
Memorial Day, Independence Day, Labor Day, Thanksgiving Day
or Christmas Day.
- Plumbers must supply a copy of State
of Illinois License and must sign plumbing permit application
- Electricians must supply a copy of State or City License, purchase a $100.00 River Forest Contractor's license, submit a $25,000 signed Surety Bond and Certificate of Insurance,
and must sign electrical permit application
- Roofers must supply a copy of their State Roofing License,
purchase a $100.00 River Forest Contractor's license, submit a $25,000 signed Surety Bond and Certificate of Insurance
- All Other Contractors (Carpenters, Masons, HVAC, etc.)
must purchase a $100.00 River Forest Contractor's License
and supply a $25,000 signed Surety Bond and Certificate of
Insurance
Permit Application Fees
- Large project applications: 2% of the net proposed cost
of the project for Single Family Residential (permit is valid
for 15 months). 2.35% for all other projects (permit is valid
for 12 months). Plumbing and electric permits and fees also
required.
- Fees for miscellaneous building
permits: Fences, roofs, sidewalks, siding, gutter, and driveway:
$100.00
- HVAC: $100.00 (plus electrical permit)
- Swimming pool: in-ground $100.00 (plus electrical permit),
above-ground $25.00 (plus electrical permit)
- Demolition: The fee for a permit for the demolition of a building or structure shall be at the rate of $1.00 per square foot of floor area with a minimum fee of $200.00 for accessory structures or $1,500.00 for primary structures.
- Sign: $100.00 (plus electrical permit)
- Electrical: $100.00 base fee plus circuits and openings.
$ 9.00 per circuit. $ 1.75 per opening
- Service upgrade: $75.00 to $200.00 (based on
amperage)
- Plumbing: $100.00 base fee plus; $15.00 per
fixture; $100.00 for street and parkway openings;
$100.00
for lawn sprinkling
system
Construction Conditions
- Permit placards must be displayed in the front window of
all projects.
- All contractors must be licensed and bonded.
- Contractors shall comply with the requirements of the
Home Repair and Remodeling Act. (Copies available
for review at Village Hall)
- All work to comply with 2003 International Residential
Code and/or 2003 International Building Code. (Copies available for
review at Village Hall)
- All electrical work to comply with National Electric Code
2005. (Click here for adopted amendments)
- Parkway trees are to be protected at all times by temporary
fencing.
- Work zones and open excavations must be protected by temporary
fencing and secured during non-working hours.
- All downspouts must be disconnected from the combined
sewer system and discharge at grade to the front or rear
yard.
Required Inspections
Preliminary - Prior to Demolition or start of Construction
Footing - Prior to Concrete: Includes Garage Slabs & Piers
Backfill - Prior to Fill. All Drain Tile and Stone should be in place.
Rough Framing
Rough Electrical
Rough Plumbing
Rough Hvac
Rough Insulation
Final - Prior To Occupancy
TO SCHEDULE INSPECTIONS, CALL (708) 366-8500 EXT. 352
Air Conditioning Compressors
Location of AC compressor units must have a side
yard setback of three
(3) feet from the property line and no louder than 74 Decibels.
Storage of Construction Material is Prohibited
on Village Streets and Parkways
No Vehicle is to Block Public Sidewalk
or Driveway
|